[edit] Introduction
Historically, cable management and support systems have been installed in the same way for decades. It is a system that works, but it's one which often results in over engineered containment with far too many brackets holding up very little cable and a lot of fresh air. However, by utilising the standards and working on manufacturers loading information it is possible to reduce the volume of steel required.
[edit] Standards
IEC 61537:2006, The Cable Tray and Ladder Standard, provides the manufacturer with information on fixing centres and testing methods for containment under load. This results in each manufacturer having load graphs which show what weight their products can carry at varying fixing centres.
Power cables are frequently installed on tray and ladder systems in such a way that it is normal to see 75% of the tray or ladder empty on long runs with the bending radius of the cable being accommodated on a large bend section. Potentially the long straight runs could easily be reduced in size, thereby reducing the volume of steel significantly. The difference in weight between ladder sizes is around 10-15%.
[edit] Related articles on Designing Buildings Wiki
[edit] External resources
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
How orchards can influence planning and development.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.